BLANCO / LOWER SALINAS VALLEY, Monterey County — October 30, 2026. The agricultural waterway known as Blanco Drain plays a role in one of the Monterey Peninsula’s most significant regional infrastructure changes. The Pure Water Monterey expansion, which Monterey One Water says began operations in October 2025, increased the amount of highly purified recycled water injected into the Seaside Groundwater Basin. The Monterey Peninsula Water Management District reports that the expanded program now provides approximately 60% of the Peninsula’s drinking-water supply. The Blanco Drain, which collects runoff from farm areas around Salinas, is one source within a varied mixture of water sources that can feed the regional recycling system.
This does not mean untreated farm drainage is sent directly into home faucets, that all Pure Water Monterey water originates from Blanco, or that the entire Blanco Drain has been diverted. The water undergoes treatment and is introduced into the groundwater basin through a regulated indirect potable reuse process.
Where the Blanco Drain fits
The regional utility Monterey One Water lists crop drainage water alongside municipal wastewater, agricultural industrial wash water and urban runoff among sources that can enter its system. It says flows collected by the Blanco Drain and Reclamation Ditch can be diverted when additional supply is needed for treatment and reuse. If not captured, those flows may continue toward the Salinas River and Monterey Bay. The exact portion captured is not a fixed percentage that can be inferred from a project website.
For people working or living near the Blanco corridor, this is an example of how local drainage management, farming and regional water supply can be physically interconnected. It does not mean an individual landowner has lost a water right, that the drain is safe for swimming or that its water meets drinking-water standards before treatment.
What changed in October 2025?
According to Monterey One Water’s expansion fact sheet, the expanded advanced water purification facility began operating in October 2025. The utility lists treatment capacity of approximately 7.6 million gallons per day and a groundwater replenishment program delivering 5,750 acre-feet per year of potable-water injections plus an operational reserve. The operator describes water being injected into the Seaside Basin through purpose-built wells and remaining in the basin for a minimum time before extraction by the public water supplier.
The Monterey Peninsula Water Management District reports that the completed expansion has become a major water-supply source, accounting for about 60% of the Peninsula’s supply. That percentage describes the regional supply portfolio, not the contribution of Blanco Drain individually. The term “drinking water” in the agency’s summary refers to the fully treated and regulated water supply, not a raw drain sample.
Water-right records require careful interpretation
California’s public electronic water-right database identifies an application A032263E involving Blanco Drain, Tembladero Slough and Reclamation Ditch, with the owner/applicant identified as Monterey County Water Resources Agency. The entry was still labeled Pending in records available in October 2026.
A pending application does not establish that the existing Pure Water Monterey plant is unpermitted or non-operational. A water-right application is only one part of a complex program involving existing permits, water recycling agreements, wastewater treatment requirements and regulatory approvals. The state registry separately lists other applications for the Water Resources Agency with statuses such as Permitted or Licensed. To understand what specifically is proposed under A032263E, users should consult its full application record and the State Water Resources Control Board, not extrapolate from a short status label.
How is this different from the nitrate-removal pilot?
Blanco News separately reported on an RCD-backed woodchip bioreactor pilot tested in 2022. That smaller, local nature-based treatment project targets nitrate in a limited volume of drainage water, while Pure Water Monterey is a much larger advanced purification and groundwater-replenishment system with multiple sources and different legal permits. A partner’s 99% nitrate-reduction figure from that old pilot must not be described as the percentage removed by the Pure Water Monterey plant or the proportion of today’s Blanco Drain diverted.
Questions for residents and water users
Residents interested in this water link can ask for current diversion volumes from Blanco Drain, seasonal variation, source-water quality, permitted bypass flows and groundwater injection totals. The operator’s published 7.6-million-gallon-per-day plant capacity is not evidence that that much water is treated every day, and the 5,750-acre-foot annual injection figure is not a measure of the drain’s individual contribution.
For current system details consult Monterey One Water; for water-supply reporting, the Monterey Peninsula Water Management District; and for legal water-right questions, the State Water Resources Control Board. Any locally observed water-quality problem requires its own verified sample and regulator response, rather than an inference from the existence of agricultural runoff.
Primary sources: Monterey One Water — Source Waters; Expansion operations and capacity; MPWMD — supply portfolio and October 2025 completion; California water-right application A032263E. Published October 30, 2026. No specific daily diversion volume, home-delivery water test result, new water-right approval or additional construction milestone is asserted.
Provide verified corrections to California58 Newsroom.
Featured image: illustrative wastewater treatment facility photographed by Patrick Federi / Unsplash. Not Pure Water Monterey, its advanced water purification facility or a Blanco Drain diversion station.
Support Blanco News
Choose how to support Blanco News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Blanco News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Blanco News
- East Blanco Road Named in Salinas’ 2026 Pavement Program: City-Limits-to-Abbott Segment Listed →
- Blanco Drain Pilot Reported 99% Nitrate Removal in 2022 Test; What the Result Does and Does Not Show →
- Blanco Road Roadwork Timeline: 2018 Overlay, $2.17 Million 2023 Resurfacing and 2024 Seal Coat →
- Blanco Road’s Role in the Marina–Salinas Transit Corridor: What Is Planned and What Is Not Funded Yet →

COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.